DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-02 | 7320202009 | DETAILS OF PIPELINES FOR INSTALLATION OF TRIM steam turbine K-10 UNIT 210-130-5MR Burshtyn TPP: coil springs STEEL IZG.METODOM hot coiling MOUNT pipe supports | ABSENT | UKRAINE | 1554.94 | 12220,95 | Belgorod | ***** | ***** |
2017-10-10 | 7304599209 | Pipe Hot SEAMLESS STEAM boilers and pipelines TU 14-3R-55-2001: DIAM. 273MM, thicker. 50mm, steel grade-15H1MF-1,500TN; HIM.SOSTAV: carbon 0.12 wt%, manganese 0.74 wt%; SILICON-0.25 wt%; 0.004% SULFUR-MSS; PHOSPHORUS-0.006% MAC; CHROME-1.21% | Th | UKRAINE | 1500 | 6993,59 | Belgorod | ***** | ***** |
2017-10-10 | 7304318009 | STEEL PIPES unalloyed steel, seamless, COLD: PIPE DIAMETER 273MM, WALL 26mm, steel grade 20 TU-14-3R 55-2001-0,774TN; PIPE DIAMETER 273MM, WALL 26mm, steel grade 20 TU-14-3R 55-2001-0,815TN; FOR BOILER | Th | UKRAINE | 1589 | 3403,01 | Belgorod | ***** | ***** |
2017-10-23 | 8404100000 | DETAILS OF PIPELINES FOR INSTALLATION OF TRIM steam turbine K-10 UNIT 210-130-5MR Burshtyn TPP: ACCESSORIES FOR COOLING VAPOR extending from the steam boiler turbine plant | ABSENT | *** | 246 | 5917,33 | Belgorod | ***** | ***** |
2017-10-23 | 8404100000 | DETAILS OF PIPELINES FOR INSTALLATION OF TRIM steam turbine K-10 UNIT 210-130-5MR Burshtyn TPP: ACCESSORIES FOR COOLING VAPOR extending from the steam boiler turbine plant | ABSENT | *** | 246 | 5917,33 | Belgorod | ***** | ***** |
2017-10-23 | 7320202009 | DETAILS OF PIPELINES FOR INSTALLATION OF TRIM steam turbine K-10 UNIT 210-130-5MR Burshtyn TPP: coil springs of steel 20 IZG.METODOM hot coiling MOUNT pipe supports | ABSENT | UKRAINE | 220.04 | 2126,72 | Belgorod | ***** | ***** |
2017-11-08 | 7320202009 | DETAILS OF PIPELINES FOR INSTALLATION OF TRIM steam turbine K-10 UNIT 210-130-5MR Burshtyn TPP: coil springs of steel 20 IZG.METODOM hot coiling MOUNT pipe supports | ABSENT | UKRAINE | 286.139 | 2485,73 | Belgorod | ***** | ***** |