DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-20 | 8419500000 | PRIMARY COIL HEATING BOILER, COPPER PLATE, brazed, with a protective coating, for hot water central heating boiler (PRINCIPLE OF HEAT TRANSFER GAS HOT WATER) MOSCHN.30 ITC ART. 0020048243 -. 3 units in 1 KART.KOR. INTO PARTS | PROTHERM | *** | 13.176 | 580,56 | Bryansk | ***** | ***** |
2017-10-20 | 8419500000 | PRIMARY COIL HEATING BOILER, COPPER PLATE, brazed, with a protective coating, for hot water central heating boiler (PRINCIPLE OF HEAT TRANSFER GAS HOT WATER) MOSCHN.30 ITC ART. 0020048243 -. 3 units in 1 KART.KOR. INTO PARTS | PROTHERM | *** | 13.176 | 580,56 | Bryansk | ***** | ***** |
2017-10-22 | 8419500000 | SECONDARY COIL HEATING BOILER, copper, plate, dual circuit, for heating water central heating boilers (PRINCIPLE OF HEAT EXCHANGE WATER WATER), 24 kW, ART. 0020025256 - 4 pcs., In 1 KART.KOR. ON THE PART OF THE PAN | PROTHERM | *** | 4.028 | 74,42 | Bryansk | ***** | ***** |
2017-10-22 | 8419500000 | SECONDARY COIL HEATING BOILER, copper, plate, dual circuit, for heating water central heating boilers (PRINCIPLE OF HEAT EXCHANGE WATER WATER), 24 kW, ART. 0020025256 - 4 pcs., In 1 KART.KOR. ON THE PART OF THE PAN | PROTHERM | *** | 4.028 | 74,42 | Bryansk | ***** | ***** |
2017-10-28 | 8419500000 | PRIMARY COIL HEATING BOILER, copper, solder, for hot water central heating boiler (PRINCIPLE OF HEAT TRANSFER GAS HOT WATER), complete with a rubber sealing ring (2 pcs), MAX. 24 kW, ART. 0020142420 - 5 PCS. | PROTHERM | *** | 14.65 | 953,33 | Bryansk | ***** | ***** |
2017-10-28 | 8419500000 | PRIMARY COIL HEATING BOILER, copper, solder, for hot water central heating boiler (PRINCIPLE OF HEAT TRANSFER GAS HOT WATER), complete with a rubber sealing ring (2 pcs), MAX. 24 kW, ART. 0020142420 - 5 PCS. | PROTHERM | *** | 14.65 | 953,33 | Bryansk | ***** | ***** |
2017-10-29 | 8419500000 | COIL PRIMARY ALUMINUM ASSEMBLY FOR WATER HEATING central heating boilers (PRINCIPLE OF HEAT HOT WATER-GAS), cpl. With graphite gasket, the nut (5 PCS.), A rubber sealing ring (2 pcs.), Clips (2 pcs.), | VAILLANT | *** | 10.2 | 149,74 | Bryansk | ***** | ***** |
2017-10-29 | 8419500000 | HEATING BOILER PRIMARY COIL ASSEMBLY (stainless steel and plastic) serves for heating water central heating boilers (PRINCIPLE OF HEAT TRANSFER GAS HOT WATER), complete with a mounting element 23 POWER ITC ART. 0020135129 - 1 pc, in | VAILLANT | *** | 7.4 | 149,74 | Bryansk | ***** | ***** |
2017-10-29 | 8419500000 | COIL PRIMARY ALUMINUM ASSEMBLY FOR WATER HEATING central heating boilers (PRINCIPLE OF HEAT HOT WATER-GAS), cpl. With graphite gasket, the nut (5 PCS.), A rubber sealing ring (2 pcs.), Clips (2 pcs.), | VAILLANT | *** | 10.2 | 149,74 | Bryansk | ***** | ***** |
2017-10-29 | 8419500000 | HEATING BOILER PRIMARY COIL ASSEMBLY (stainless steel and plastic) serves for heating water central heating boilers (PRINCIPLE OF HEAT TRANSFER GAS HOT WATER), complete with a mounting element 23 POWER ITC ART. 0020135129 - 1 pc, in | VAILLANT | *** | 7.4 | 149,74 | Bryansk | ***** | ***** |