DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-10 | 7326909807 | STEEL IMPELLER a hollow steel part cylindrical shape with external blades, METHOD OF MANUFACTURING - by the complex machining serves for the vorticity stream of drilling fluid in the borehole installation. * Drilling equipment | GURECKY MANUFACTURING SERVICE | UNITED ARAB EMIRATES | 6.78 | 4978,47 | MOSCOW | ***** | ***** |
2017-10-19 | 7307991000 | Steel fittings, threaded NOT CAST STEEL 40X, 45. Designed to provide to seal the submersible pump MODULE INSTALLATIONS for pumping formation fluid from the well. SCOPE OF THE OIL INDUSTRY. | "ABSENT" | UNITED ARAB EMIRATES | 12.49 | 145,15 | Jebel Ali | ***** | ***** |
2017-10-19 | 7307291008 | Steel fittings, threaded NOT CAST STEEL 40X13. Designed to provide to seal the submersible pump MODULE INSTALLATIONS for pumping formation fluid from the well. SCOPE of application THE OIL INDUSTRY. | "ABSENT" | UNITED ARAB EMIRATES | 12.49 | 349,71 | Jebel Ali | ***** | ***** |
2017-10-24 | 7307991000 | Steel fittings, DO NOT CAST STEEL 40X. Designed to provide to seal the submersible pump MODULE INSTALLATIONS for pumping formation fluid from the well. SCOPE of application THE OIL INDUSTRY. | "ABSENT" | UNITED ARAB EMIRATES | 34.3 | 1431,44 | ABU DHABI | ***** | ***** |
2017-10-31 | 7307998009 | Couplings for pipelines pumping a drilling fluid, carbon steel welded pressure up to 8MPA, 8 PCS, | SCHLUMBERGER | UNITED ARAB EMIRATES | 0.4 | 625,46 | *** | ***** | ***** |
2017-10-31 | 7318156900 | Head screws with hexagon socket, CARBON STEEL STEEL not any installation without additional structural elements for assembly and installation of ESP DOWNLOADS drilling fluid into the well, with breaking point of dilation. 750MPA; ROD END | NOT INSTALLED | UNITED ARAB EMIRATES | 0.15 | 23,56 | *** | ***** | ***** |
2017-11-20 | 7307291008 | Steel fittings, threaded NOT CAST STEEL 40X13, 12X18H10T. Designed to provide to seal the submersible pump MODULE INSTALLATIONS for pumping formation fluid from the well. SCOPE OF OIL | "ABSENT" | UNITED ARAB EMIRATES | 7.208 | 1333,76 | Jebel Ali | ***** | ***** |