DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-11-29 | 7326909807 | SEALING RINGS OF IRON OR STEEL CONSTRUCTED. Combined method (Stamping and Forging) for securing the cable gland for cable lines on the drilling platform, NOT FOR NUCLEAR TECHNOLOGIES - 60 PCS | SMR | UNITED ARAB EMIRATES | 0.45 | 196,8 | *** | ***** | ***** |
2017-11-29 | 7326909807 | TENSION DRIVE V-belts, air, FAN, IZGTOVLEN by stamping, forging, assembly and turning - combined with. MANNER OF IRON OR STEEL, NOT FOR NUCLEAR TECHNOLOGIES - 1 pc | NOT INSTALLED | UNITED ARAB EMIRATES | 0.08 | 139,65 | *** | ***** | ***** |
2017-11-29 | 7326909807 | Support legs of iron or steel making composite WAY (Stamping and Forging) to place pipelines at their service, to work on the Sakhalin-1 PROETKE 12 PCS. | NOT INSTALLED | UNITED ARAB EMIRATES | 179.64 | 2173,32 | *** | ***** | ***** |
2017-11-29 | 7326909807 | REFERENCE BLOCK OF IRON OR STEEL MADE combined way (Stamping and Forging), for fixing the support racks for arrangement of the piping, to work on the Sakhalin-1 project - 1 pc. | NOT INSTALLED | UNITED ARAB EMIRATES | 12.07 | 133,68 | *** | ***** | ***** |
2017-11-29 | 7326909807 | REFERENCE BLOCK OF IRON OR STEEL MADE combined way (Stamping and Forging), MOUNT SUPPORT RACK FOR PLACEMENT OF PIPELINES, to work on the Sakhalin-1 project - 1 PCS. | NOT INSTALLED | UNITED ARAB EMIRATES | 9.3 | 75,66 | *** | ***** | ***** |
2017-11-29 | 7326909807 | Ring gaskets MADE combined way (Stamping and Forging) OF IRON OR STEEL PIPES FOR THE INSTALLATION OF MIXING drilling mud components - 1 PCS. | WOLAR | UNITED ARAB EMIRATES | 4 | 71 | *** | ***** | ***** |
2017-11-29 | 7326909807 | Ring gaskets OF IRON OR STEEL MADE combined way (Stamping and Forging), for units USTANOVKIPEREMESHIVANIYA Birr COMPONENTS SOLUTION - 5 PCS. | VECTOR | UNITED ARAB EMIRATES | 8.7 | 2868,3 | *** | ***** | ***** |
2017-11-29 | 7326909807 | Ring gaskets OF IRON OR STEEL MADE combined way (Stamping and Forging) PIPELINE INSTALLATION FOR MIXING drilling mud components, different sizes - 5 pieces. | LAMONS | UNITED ARAB EMIRATES | 4.81 | 168,75 | *** | ***** | ***** |