DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-02 | 7304599209 | DETAILS FOR PIPELINE INSTALLATION OF TRIM TO STEAM TURBINE UNIT 10-210-130-5MR Burshtyn TPP: PIPE T / K FROM LEGIR.STALI 12H1MF ODS-E CARBON MASS.â„– 0.1, chromium 1.2 wt%, manganese 0. 7 AMIS.%. | ABSENT | UKRAINE | 1738.6 | 13753,89 | Belgorod | ***** | ***** |
2017-10-09 | 7304599209 | DETAILS FOR PIPELINE INSTALLATION OF TRIM TO STEAM TURBINE UNIT 10-210-130-5MR Burshtyn TPP: PIPE T / K FROM LEGIR.STALI 12H1MF ODS-E CARBON MASS.â„– 0.1, chromium 1.2 wt%, manganese 0. 7 AMIS.%. | ABSENT | UKRAINE | 1182.46 | 11674,71 | Belgorod | ***** | ***** |
2017-10-10 | 7304599209 | Pipe Hot SEAMLESS STEAM boilers and pipelines TU 14-3R-55-2001: DIAM. 273MM, thicker. 50mm, steel grade-15H1MF-1,500TN; HIM.SOSTAV: carbon 0.12 wt%, manganese 0.74 wt%; SILICON-0.25 wt%; 0.004% SULFUR-MSS; PHOSPHORUS-0.006% MAC; CHROME-1.21% | Th | UKRAINE | 1500 | 6993,59 | Belgorod | ***** | ***** |
2017-10-23 | 7304599209 | DETAILS FOR PIPELINE INSTALLATION OF TRIM TO STEAM TURBINE UNIT 10-210-130-5MR Burshtyn TPP: PIPE T / K FROM OVER LEGIR.STALI 12H1MF DIAM.NE 168,3MM, ODS-E CARBON MASS.â„– 0.1, 1 CHROMIUM , 2 wt.%, manganese 0.7 AMIS.% | ABSENT | UKRAINE | 463.5 | 3678,76 | Belgorod | ***** | ***** |
2017-11-08 | 7304599209 | DETAILS FOR PIPELINE INSTALLATION OF TRIM TO STEAM TURBINE UNIT 10-210-130-5MR Burshtyn TPP: PIPE T / K FROM OVER LEGIR.STALI 12H1MF DIAM.NE 168,3MM, ODS-E CARBON MASS.â„– 0.1, 1 CHROMIUM , 2 wt.%, manganese 0.7 AMIS.% | ABSENT | UKRAINE | 28.1 | 209,96 | Belgorod | ***** | ***** |