DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-17 | 7326909807 | KAT. PVN. 4.2 OUTPUT SHAFT 8B6.303.079 (280.783) 1.4 7 PCS REF IN LIST â„– 2 SHAFT OF STEEL, compounds Slot with cylinder block, part of the pumping unit The plunger pump Su30MKI | *** | INDIA | 0.16 | 8058,82 | Mumbai airport | ***** | ***** |
2017-10-26 | 7326909807 | Steel clamping inserts, ART.101729245-4SHT. MANUFACTURING MATERIAL Stainless Steel, complete two locking pins LANDING STAINLESS STEEL. METHOD FOR PRODUCING turning, assembly. IS the locking device / | MOGEMA | MEXICO | 0.04 | 543,34 | *** | ***** | ***** |
2017-11-08 | 7326909807 | Slider NEW, IZG.IZ STEEL U10A (87%) and brass LS59-1 (13%), CAST NOT NOT Cova., Not stamped., Not sintered. AFTER MEH.OBRABOTKI, PRED.DLYA pinholes CLOCK clockwork speedometers locomotive | Figurative trademark, PRINADLEZHAYSHY of "Electrician" | SLOVAKIA | 0.413 | 949,56 | Penza | ***** | ***** |
2017-11-29 | 7326909807 | CAP LOCK MADE OF IRON OR STEEL by stamping followed by building cpl. With the pressure plate, the fastening element for securing the cable lines MOUNTING SYSTEM PROTECTION PROTIAVARIYNOY oil producing. OBJECT NOT FOR NUCLEAR | RITALL | UNITED ARAB EMIRATES | 7 | 5210 | *** | ***** | ***** |
2017-11-29 | 7326909807 | CAP LOCK MADE OF IRON OR STEEL, by stamping FOLLOWED bending, punching, threaded connections, dlch hold and secure the cable when laying cable lines in the oil-producing units, not for nuclear technology | NOT INSTALLED | UNITED ARAB EMIRATES | 0.56 | 51,3 | *** | ***** | ***** |
2017-11-29 | 7326909807 | REFERENCE BLOCK OF IRON OR STEEL MADE combined way (Stamping and Forging), for fixing the support racks for arrangement of the piping, to work on the Sakhalin-1 project - 1 pc. | NOT INSTALLED | UNITED ARAB EMIRATES | 12.07 | 133,68 | *** | ***** | ***** |
2017-11-29 | 7326909807 | REFERENCE BLOCK OF IRON OR STEEL MADE combined way (Stamping and Forging), MOUNT SUPPORT RACK FOR PLACEMENT OF PIPELINES, to work on the Sakhalin-1 project - 1 PCS. | NOT INSTALLED | UNITED ARAB EMIRATES | 9.3 | 75,66 | *** | ***** | ***** |
2017-11-30 | 7326909807 | COUPLING HOMUT.IZGOTOVLENNY BY STAMPING OF METAL BANDS FROM SUBSEQUENT CHENYH cutting holes for fixing and assembly with locking unit of metal. FOR RETENTION COMPONENTS electric pipe heat tracing, 10 PCS | THERMON, | UNITED ARAB EMIRATES | 0.375 | 30 | *** | ***** | ***** |