DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-09-05 | 7326909807 | Part of the conveyor-lift system, packaged on a pallet, remove the tape for easy portability, B / W: | "ENERGO PROJECTS", | BELGIUM | 127044 | 216051,94 | ZEEBRUGGE | ***** | ***** |
2017-09-06 | 7326909807 | Part of the conveyor-lift system, packaged on a pallet, remove the tape for easy portability, B / W: | "ENERGO PROJECTS", | BELGIUM | 92974 | 154928,63 | ZEEBRUGGE | ***** | ***** |
2017-09-06 | 7326909807 | Part of the conveyor-lift system, packaged on a pallet, remove the tape for easy portability, B / W: | "ENERGO PROJECTS", | BELGIUM | 17950 | 29733,79 | ZEEBRUGGE | ***** | ***** |
2017-09-07 | 7326909807 | Part of the conveyor-lift system, packaged on a pallet, remove the tape for easy portability, B / W: | "ENERGO PROJECTS", | BELGIUM | 71800 | *** | ZEEBRUGGE | ***** | ***** |
2017-09-07 | 7326909807 | Part of the conveyor-lift system, packaged on a pallet, remove the tape for easy portability, B / W: | "ENERGO PROJECTS", | BELGIUM | 127044 | *** | ZEEBRUGGE | ***** | ***** |
2017-10-03 | 7326909807 | Videos from ferrous metals, 32MMID 150MMOD 48MM. Tape guides before the node NATAZHENIYA CUTTING RIBBON MANUFACTURING IN HELL. # PTS-001-002. MANUFACTURING MATERIAL: STEEL ShKh15; STEEL heat. METHOD OF MANUFACTURING: ASSEMBLY. CM. ANNEX FIELD OF APPLICATION | SAPSAN-INTER | INDIA | 2.55 | 370,64 | NEW DELHI | ***** | ***** |
2017-10-04 | 7326909807 | 9999-1200000-03 COLLAR worm EXHAUST SYSTEM A / M (steel tape, fasteners, screws), of iron / for KAMAZ 72 PCS | KAMAZ | LITHUANIA | 1.08 | 290,64 | Rokiskis | ***** | ***** |
2017-10-04 | 7326909807 | MIKALOR10-16 / 9W1 COLLAR worm (steel tape, fasteners, screws) for securing, of iron / for KAMAZ PCS 144 | KAMAZ | LITHUANIA | 1.72 | 22,09 | Rokiskis | ***** | ***** |
2017-10-05 | 7326909807 | MIKALOR 120-140 / 12W1 COLLAR worm (steel tape, fasteners, screws) for securing, of iron / for KAMAZ 6 PCS | KAMAZ | MOLDOVA | 0.34 | 5,49 | Naberezhnye Chelny | ***** | ***** |
2017-10-06 | 7326909807 | Frames for spring units in different sizes. MADE OF PLYUSCHONOY, steel tape. PRODUCTION PROCESS: Frame desired shape and size is formed by BENDING TAPE bonded with its end. | ABSENT | LATVIA | 1096 | 1354,84 | RIGA | ***** | ***** |