DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-09-02 | 8431498009 | COMPONENTS USED FOR MODEL Loader XE215S. MADE OF IRON OR STEEL. 1. TRACK ASSEMBLY, MM 600 - 2 BOLT M16H45 PCS 2. - 3. 16 PCS TOWING WHEEL - 4 pcs 4. Idlers - 2 PCS OPORONOE WHEEL 5. - 6. 16 PCS BOLT M18H90 axlebox | *** | CHINA | 3360 | 7280,98 | *** | ***** | ***** |
2017-09-22 | 8431498009 | NEW SPARE PARTS FOR REPAIR AND MAINTENANCE Front loaders WZ30-25, are made. OF IRON OR STEEL machining methods, FRONT AXLE ASSEMBLY, bolted and digital methods of attachment, KATALO.NOMER absences: Pack | *** | CHINA | 240 | 756,66 | *** | ***** | ***** |
2017-09-22 | 8431498009 | NEW SPARE PARTS FOR REPAIR AND MAINTENANCE EXCAVATOR LIUGONG, are made. OF IRON OR STEEL machining methods, rear axle, bolted and digital methods of attachment KATALOZH. NO NUMBER: A unpacked SHANDON | *** | CHINA | 620 | 1954,57 | *** | ***** | ***** |
2017-09-22 | 8431498009 | NEW SPARE PARTS FOR REPAIR AND MAINTENANCE wheel loaders are made. OF IRON OR STEEL machining methods, rear axle, bolted and digital methods of attachment Catalog number MISSING: Unpacked SHA | *** | CHINA | 340 | 1071,84 | *** | ***** | ***** |
2017-10-24 | 8431498009 | MOST FORWARD LEADING TO BE INSTALLED IN LOADER AND TRANSFER torque from the propeller shaft to the wheels. The bridge consists of the top flanges, wheel gears, drive with differential. FRONT AXLE bolted to the front frame | CHANGLIN | CHINA | 1039.5 | 2560,82 | BLAGOVESCHENSK | ***** | ***** |
2017-10-24 | 8431498009 | MOST FORWARD LEADING TO BE INSTALLED IN LOADER AND TRANSFER torque from the propeller shaft to the wheels. The bridge consists of the top flanges, wheel gears, drive with differential. FRONT AXLE bolted to the front frame | CHANGLIN | CHINA | 1039.5 | 2560,82 | BLAGOVESCHENSK | ***** | ***** |