DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-03 | 8414594000 | CENTRIFUGAL FAN FOR EXHAUST GASES embedded in BOILERS CENTRAL HEATING POWER 200W, aluminum alloy, C MONTAZHN.KOMPLEKTOM (3 STEEL FIXING SCREW M4H30, rubber sealing ring 4 STEEL nuts and washers | VAILLANT | *** | 6.06 | 591,06 | Bryansk | ***** | ***** |
2017-10-03 | 8414594000 | CENTRIFUGAL FAN FOR EXHAUST GASES embedded in BOILERS CENTRAL HEATING POWER 200W, aluminum alloy, C MONTAZHN.KOMPLEKTOM (3 STEEL FIXING SCREW M4H30, rubber sealing ring 4 STEEL nuts and washers | VAILLANT | *** | 6.06 | 591,06 | Bryansk | ***** | ***** |
2017-10-08 | 8481109908 | REDUCING GAS VALVE FROM ALUMINUM ALLOY FOR PRESSURE REGULATION central heating boilers, with electric and assembly kit (rubber gaskets, sealing rings AFM34 (2 pcs), screws made of stainless. STEEL) | VAILLANT | *** | 0.706 | 53,78 | Bryansk | ***** | ***** |
2017-10-08 | 8403909000 | PART central heating boilers - COPPER HYDRAULIC tube connecting the boiler hydraulic elements, with a mounting kit (SEALING RING RUBBER - 1 PCS, PACKING RING FROM MINERAL FIBER Pressed -. 1 units. | VAILLANT | *** | 0.13 | 11,79 | Bryansk | ***** | ***** |
2017-10-08 | 8403909000 | PART central heating boilers - COPPER HYDRAULIC tube connecting the boiler hydraulic elements, with a mounting kit (RING sealing rubber - 2 PCS, clamps made from spring-BRACKET PROVOLOLKI -. 2 pcs.), | VAILLANT | *** | 0.216 | 7,72 | Bryansk | ***** | ***** |
2017-10-08 | 8403909000 | PART central heating boilers - curved HYDRAULIC copper tube complete with two rubber sealing rings, retainer made of steel wire and fixing steel plates connecting the hydraulic components inside the boiler, | VAILLANT | *** | 0.207 | 7,72 | Bryansk | ***** | ***** |
2017-10-08 | 8403909000 | PART central heating boilers - HYDRAULIC COPPER TUBE, complete with a mounting element (CLAMP spring steel - 1 PCS, RUBBER SEALING RINGS -.. 3 PCS) connecting the hydraulic elements inside the boiler, | VAILLANT | *** | 0.26 | 9,73 | Bryansk | ***** | ***** |
2017-10-08 | 8419500000 | Stainless steel heat exchanger bypass ratio, for heating water central heating boilers (PRINCIPLE OF HEAT EXCHANGE WATER WATER), with a sealing rubber ring (4 pcs.) MAX. 50 kW, ART. 0020059452 -. 80 units in the IND. UP-TO KE 1 pallet | VAILLANT | *** | 70.96 | 1844,53 | Bryansk | ***** | ***** |
2017-10-08 | 7325999009 | MOLDED ARTICLES OF IRON METAL - HANDLE L-shaped PTZ, steel, to control operation of central heating boiler, complete with a sealing rubber ring (2 pcs.) METHOD FOR PRODUCING - casting, | VAILLANT | *** | 0.26 | 25,72 | Bryansk | ***** | ***** |
2017-10-08 | 8481109908 | REDUCING GAS VALVE FROM ALUMINUM ALLOY FOR PRESSURE REGULATION central heating boilers, with electric and assembly kit (rubber gaskets, sealing rings AFM34 (2 pcs), screws made of stainless. STEEL) | VAILLANT | *** | 0.706 | 53,78 | Bryansk | ***** | ***** |