DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-19 | 7308909809 | METAL OF IRON OR STEEL - BASE (RAMA) is a spiral TRAY MADE FROM shaped pipes and metal sheets, fitted with the aid of bolted joints and concreting in the ground are intended for installation INSTALLATION | "SHUANGCHENG" | CHINA | 2773 | 5141,02 | Dunin | ***** | ***** |
2017-10-30 | 7308909809 | DESCRIPTION: Composite metallic KONTSTRUKTSII COLLECTED ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of a support, beams, tubes, sheets, plates, props, KOLO | not designated | CHINA | 798234 | 1578710,00 | Neryungri | ***** | ***** |
2017-11-22 | 7308909809 | Prefabricated metal structure assembled ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of: poles, beams, tubes, sheets, plates, props, the colonies B | NOT INDICATED | CHINA | 377146.25 | 747991,25 | Neryungri | ***** | ***** |
2017-11-23 | 7308909809 | Prefabricated metal structure assembled ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of: poles, beams, tubes, sheets, plates, props, the colonies B | NOT INDICATED | CHINA | 37495.56 | 74434,41 | Neryungri | ***** | ***** |
2017-11-27 | 7308909809 | Prefabricated metal structure assembled ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of: poles, beams, tubes, sheets, plates, props, the colonies B | NOT INDICATED | CHINA | 37409.08 | 74294,43 | Neryungri | ***** | ***** |
2017-11-27 | 7308909809 | Prefabricated metal structure assembled ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of: poles, beams, tubes, sheets, plates, props, the colonies B | NOT INDICATED | CHINA | 37471.52 | 74418,44 | Neryungri | ***** | ***** |
2017-11-27 | 7308909809 | Prefabricated metal structure assembled ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of: poles, beams, tubes, sheets, plates, props, the colonies B | NOT INDICATED | CHINA | 38377.24 | 76022,63 | Neryungri | ***** | ***** |
2017-11-27 | 7308909809 | Prefabricated metal structure assembled ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of: poles, beams, tubes, sheets, plates, props, the colonies B | NOT INDICATED | CHINA | 37430 | 74335,98 | Neryungri | ***** | ***** |
2017-11-27 | 7308909809 | Prefabricated metal structure assembled ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of: poles, beams, tubes, sheets, plates, props, the colonies B | NOT INDICATED | CHINA | 37327.53 | 74132,47 | Neryungri | ***** | ***** |
2017-11-27 | 7308909809 | Prefabricated metal structure assembled ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of: poles, beams, tubes, sheets, plates, props, the colonies B | NOT INDICATED | CHINA | 38071.74 | 75610,48 | Neryungri | ***** | ***** |